Client Requirements:  

Nuffield Health wished to centralise their call centres into one existing location in Dorking from sites in Chichester and Epsom. The Dorking site was refurbished and reconfigured to accommodate the arrival of the Chichester and Epsom teams. A total of 200 staff were to be relocated within this project which was to be carried out over 6 weekends.

Project Solution:

Premier worked closely with a project manager on the Nuffield Health project team, Premier completed numerous site visits and detailed planning meetings which was an integral part of the preparation for this project. Premier supplied crates to each of the three locations in advance of the scheduled moves.

Following the departure from the Chichester site, Premier Sustain effectuated a two-day sustainable clearance to collect unwanted items and materials for reuse and recycling.

Services Provided

  • Supply of crates
  • Packing and unpacking of crates
  • Transport of crates
  • Sustainable Clearance

Project Feedback

Premier carried out the project on time and stayed within budget, we were also able to deliver additional services that were outside of the initial scope such as the sustainable clearance. As a result of this successful project, Premier has gained and additional furniture reconfigurations project for the client at their Epsom site.